Fire Hydrant Replacement

“It is important to public safety that malfunctioning fire hydrants be repaired or replaced as soon as possible after being identified.” The “After” of the completed fire hydrant replacement

read more

Precipitation Gauge

Precipitation gauge mounted on Township of Falls Authority office building roof to correlate precipitation levels with monitored sewage flows. This will help the Authority determine its priorities in tackling infiltration due precipitation to its sewer pipes.

read more

New Materials Bunker

As part of its efforts to expand its excavation and infrastructure repair capabilities, the Township of Falls Authority has constructed two excavation materials bunkers at its 557 Lincoln Highway location in Fairless Hills.

read more

Fallsington Day

Left to right: Deputy Business Manager Tammy McAnulty, Business Manager Megan Parmer and Program Manager Rachel Jardine. Caption/Story: Administrative staff representing the Township of Falls Authority at the annual Fallsington Day 2019 festivities on Saturday, October 12. Over 200 area residents visited the Authority booth during the daylong celebration.

read more

Metering Images

1. Example of ground water infiltration to sewer main through a failing joint seal. This is one the types of unwanted water infiltration to sewer mains that increases sewage flows and treatment costs. The goal of the Authority’s long-term Infiltration and Inflow mitigation program is to identify and correct these costly conditions. 2. A technician […]

read more

Penn Warner Elevated Water Storage Tank Painting and Water Conservation

Most of these photos show an example of the Authority’s water storage tank maintenance program; specifically, the exterior painting of the Penn Warner elevated water storage tank. Another photo shows toilet tank dye tablets used to detect toilet tank flapper leaks – one of the most common causes of residential water waste and unnecessary expense. […]

read more

Flushing

All of the Authority’s hydrants undergo systematic flushing once a year to remove sediment buildup from the system and to ensure all of the hydrants are in working order.

read more

Fallsington Interconnect

One of the Authority’s goals is to improve water flow through the distribution system by eliminating dead ends such as existed in the Penn Valley section of Falls Township. In 2019, the Authority created another interconnect with its water supplier, Lower Bucks County Joint Municipal Authority at the intersection of New Falls Rd. and Fallsington-Tullytown Rd. […]

read more

Infiltration Abatement

The pipe lining occurred in the Spring and Summer of 2019 The photos show the installation of sewer main liners. The process involves drawing a flexible liner “sock” through the sewer main from the manholes. The liner is then steam heated to take the shape of the pipe surrounding it and then cured, or hardened, […]

read more